IMG Composite Providing the Complete Composite Solution

Next
Previous
PDF Print E-mail

Onshore CompoSol Flat

CompoSol Flat is used as a wet-lay-up on all types of flat surfaces (horizontal or vertical) to restore operational capacity.

Surfaces should be clean and free from loose rust and contamination and preparation should be in line with the requirements of the latest international standards.

CompoSol Flat should only be applied by applicators trained and certificated in line with ACORES Audit requirements.

BENEFITS
• Cost effective
• Can be applied to surfaces prepared to ST2 standard
• Applied under cold permit to work procedures
• Minimises added weight
• Easy to apply, no special equipment required
• 100% Solids—No shrinkage
• Can be used to create surface falls
• Fire Rated to BS 476 Parts 6 and 7
• Carbon Footprint less than 40% of steel replacement PRODUCT DATA
• Application Temperature +10oC to +50oC
• Service Temperature –50oC to +60oC
• Pot Life 45 –60 minutes at 20oC
• Gel Time 4 hours at 20oC
• Cure Time 24 hours at 20oC
• Overcoat in 16 hours with solvent-free paint
• Storage: In original containers in dry conditions between 5oC and 35oC
• Protect from frost and excessive heat

 

Latest News

IMG Composites Join the NOF Energy Network

IMG Composites Join the NOF Energy Network

IMG Composites have shown their support for UK industry body NOF Energy by joining their membership. The business development organisation based in the North East of England ope... Read more...

Investment in R&D continues

Investment in R&D continues

IMG Composites continue to be committed to maintaining their position at the cutting edge of composite technologies through investment in Research and Development projects. April the 20th ... Read more...

Caisson Integrity Article

Caisson Integrity Article

Well received article on caisson rehabilitation utilising composites

For the August 2011 edition of World Pipelines magazine IMG Composites wrote an article on the rehabilitation of offshore caiss... Read more...

Graduate intake comes good in management shakeup

Graduate intake comes good in management shakeup

IMG Composites is reaping the benefits of previous investment in graduate development as two members of staff recruited straight from university move into management posit... Read more...

Saudi Aramco Thrust Boring Project Initiated

Saudi Aramco Thrust Boring Project Initiated.

New technique utilises IMG Composites wrap protection.

03122011159Read more...

Contract with Indian Oil & Gas Giant Boosts Asian Presence

Contract with Indian Oil & Gas Giant Boosts Asian Presence

IMG Composites are currently carrying out their first contract win in India. The first repairs are underway at the Mahul Refinery, which brings into action t... Read more...

Bahrain Best Practice Exhibition Presentation

Bahrain Best Practice Exhibition Presentation

IMG Composites Opens Day of Rehabilitation Papers at International Exhibition

IMG Composites participated in the inaugural International Conference and Exhibition on Best Practices... Read more...

Previous
Next